GM

George Martinez Bio – Construction

Mr. Martinez started his unique career in Construction Research Laboratory, constructing mockups of high-rise buildings for seismic testing and high wind threshold to failure. This gave an inside look at the building’s strengths and weaknesses, how to exploit the buildings and how to improve the fortification of the facilities.

Further studies advanced Mr. Martinez as one of only 5 Licensed Master of Transportation Assemblies 97M0017 (automation/ robotics) within the state of Florida. George acquired additional national certification by Underwriters Laboratories (UL) for Control Panel assemblies, and programing. (Rockwell/ RS Logic etc.)

Mr. Martinez continued to expand his construction company, BRI as a General Contractor. (CGC1506096) his oversight of High Rises, Airports, Distribution Systems, Security System Integration for Department of Homeland Security Scanners (Raytheon), through many system platforms spanning numerous continents.

This Brief dossier of George’s career should help future clients in further understanding his Construction Management potentials.

 

Industrial
Florida Power & Light: USA – Turkey Point Nuclear Power Plant – New maintenance warehouse distribution 45k square feet.
Cargill Food International – USA – New railway distribution system for liquid line commodities to equal 150k square feet.
Southeast Automotive – USA – South America – New distribution warehouse with full automation system and structural system and flooring 220k square feet.
Motorola: USA – Puerto Rico – Warehouse expansion system with
elevators and structural racking 51k square feet.

 

Food, Produce & Manufacture
Trujillo Brothers: USA – New 185k square foot industrial warehouse, full build out for commodities manufacturing, to include; silos, mold ejection equipment, conveyors, power grid, steam vessel, automation and office space.
Publix: USA – New warehouse for structural rack distribution system, to
include; cold storage to equal 400k square feet.
Winn Dixie: USA – New warehouse for structural rack distribution system, to
include cold storage and equal 385k square feet.
McArthur Dairy: USA – Expansion of existing warehouse for new structural rack
system and loading docks, to include cold storage and equal 40k
square feet.

 

Government / Security
Sensormatic: USA – Expansion of building for structural steel storage with logistical analysis and dynamics for intrafraction of security and distribution assemblies. Equaling 140k square feet.
US Army: USA – Storage facility for new secure multi-level Security system of warehousing to equal 90k square feet.
Dept. of Homeland Security: Raytheon USA / International – Expansion of Airport/Private sector security systems for integration of explosive detection equipment, (scanner, thermal and airborne) assemblies of existing and new building. Installation performed over 20 locations thought the USA, South-Central America and the Caribbean. Equaling over 500k square feet effected.
Dominican Republic DR – Complete site engineering of three airport facilities. (La Capital, Puerto Plata, and Samana)
Barnett Bank: USA – Expansion of building for high capacity structural steel storage facility to equal 30k square feet.